QR-09E ROUGH ELECTRICAL #F9A825 ANCHOR DEVELOPMENT GROUP · GC #358732 · HVAC #365678 · ELEC #365679 ACCOUNTABLE: ELECTRICAL CONTRACTOR qr.azanchordevelopment.com/w/qr-09e SCOPE Rough electrical / service KEY RELEASE / HOLD POINT Rough / service inspection, labels, bonding STATUS (NO STEP MAY BE SKIPPED) PM OVERRIDE MUST BE DOCUMENTED 1. Draft 2. Not released 3. Ready 4. Active 5. QC hold 6. Inspection hold 7. Blocked 8. Ready for next trade 9. Released 10. Reopened 11. Closed FIELD DATA COMPANY ROC CLASS / LICENSE # VERIFIED FOREMAN PHONE BASELINE START BASELINE FINISH FORECAST START FORECAST FINISH ACTUAL START ACTUAL FINISH QTY BASIS / TARGET INSTALLED TO DATE PREDECESSOR SUCCESSOR BLOCKER BLOCKER OWNER / PROMISED DATE EVIDENCE REQUIRED BEFORE RELEASE AN UNCHECKED BOX IS NOT PROOF Inspection Photos Test report Checklist As-built BLOCKER → SUPERINTENDENT IMMEDIATELY PM IF CRITICAL-PATH OR UNRESOLVED NEXT SHIFT · CRITICAL SEVERITY = STOP WORK ADG-PROJECT-LOT-QR-09E-ROUGH-ELECTRICAL-[AREA]-[PKG-REV] QR Job Board v2 Field-control interface only. Approved permit set, AHJ codes, approved changes and contracts govern.
QR-09E

ROUGH ELECTRICAL

PDF pages 17-18

Electrical Systems

1. PD Malfunctioning of electrical fixtures, switches or outlets.

AT None.

CR Contractor should make necessary repairs.

2. PD Breaker trips with normal use.

AT Breaker should operate as intended.

CR Contractor should replace defective breaker in accordance with manufacturer's warranty.

3. PD Electrical equipment not level, plumb and true.

AT None.

CR Contractor should make necessary repairs.

4. PD Electrical equipment or materials not secure or adequately supported.

AT None.

CR Contractor should make necessary repairs.

5. PD Switch located behind door.

AT All boxes for switches should be located on the side of the doorframe opposite the hinge.

CR Contractor should make necessary repairs.

6. PD Switches or plates span two different materials and are not flush.

AT Switches or plates should not span different types of building materials, vertically or horizontally, unless specified and then should be flush with both materials.

CR Contractor should make necessary repairs.

7. PD More than 2 wires installed under one strap.

AT No more than 2 wires per strap.

CR Contractor should make necessary repairs.

8. PD More than 3 wires installed in one box.

AT No more than 3 wires per box.

CR Contractor should make necessary repairs.

Code Compliance Revision 0.3 · Source-currentness recheck: September 30, 2026 · Controlled review checklist

This is a stand-alone code compliance checklist for this trade, added to the workmanship standards above and to full project-code requirements. It is not a complete trade code manual. It covers reviewed 2016–2026 changes and local implementation events; an older provision newly enforced locally is labeled as implementation, not claimed as newly invented code.

Job
Address / unit
Scope
Building / fire AHJ
Permit / edition / amendments
Approved-plan revision
Energy / green path
Applicable section / TIA / local amendment
Project-specific code verification by / date
Subcontractor / foreman
PM

Only affected new, replaced or altered work and legally triggered upgrades are included. The PM selects the applicable legal requirement and the compatible mandatory Anchor overlay before work starts. Unresolved source, limit or listing conflicts remain HOLD, and N/A requires a written reason. Checking a box means the item and its required evidence passed, not merely that it was read.

Where a city's legal minimum is lower, the compatible higher check remains an Anchor standard unless Cory approves a company-only exception. A city's nonadoption alone is not a reason to mark the higher company check N/A; actual scope, technical compatibility and legal/design/listing conflicts must be resolved.

Existing QR phases: Service branch, QR-09E, QR-18E.

ES-01Expanded kitchen GFCI scope

Protect qualifying 125–250-V kitchen receptacles, not just countertop-serving locations, with readily accessible protection. Resolve the exact adopted section and ratings.

Change / applicability
2023 NEC update. Affected: qualifying kitchen receptacles under the applicable circuit/rating scope or the accepted higher company baseline.
Required record
Circuit/receptacle map, applicable section/ratings and safe function test.
Hold point
Before energization / final release.

ES-02GFCI for specified appliances

Provide the required GFCI for the qualifying appliance branch circuit/outlet, whether hardwired or plug-connected. Record the exact appliance rule instead of assuming every appliance is included.

Change / applicability
2023 NEC update. Affected: specified appliances within the adopted list/rating scope.
Required record
Appliance models, circuit/device mapping and exact section/exception.
Hold point
Before energization.

ES-03Dwelling feeder emergency disconnect

Install the accepted outside emergency disconnect with appropriate fault rating, grouping and marking. Distinguish feeder and service rules.

Change / applicability
2023 NEC expansion beyond 2020 service provisions. Affected: qualifying one-/two-family feeder-supplied dwellings.
Required record
One-line/load/fault basis, equipment rating and marked installation.
Hold point
Before utility/energization release.

ES-04Disconnect exposed-live-parts access

Use the required lockable/tool-access enclosure arrangement where opening a door exposes live parts, per the approved product/code basis.

Change / applicability
2023 NEC update. Affected: applicable readily accessible residential disconnect enclosures.
Required record
Product listing/access design and installation photo.
Hold point
Before energization.

ES-05Island/peninsula receptacle redesign

Resolve local amendments before fabrication. Phoenix requires at least one outlet on each qualifying island/peninsula with long dimension ≥ 24 in. and short dimension ≥ 12 in., and restores a conditional below-counter exception; unamended 2023 permits omission with accepted future provision. Anchor's safer above/in-surface layout is a company design choice, not a statement that Phoenix forbids every below-counter outlet.

Change / applicability
2020/2023 model changes; Phoenix amendment effective August 1, 2025. Affected: new/altered islands or peninsulas.
Required record
Exact local section, countertop dimensions, listed outlet and designer/AHJ-approved layout.
Hold point
Before cabinet/counter fabrication and final release.

ES-06HVAC GFCI expiry and local enforcement

Do not rely on the expired model exception as a current exemption. Resolve the actual adopted NEC/TIA/local rule for single-phase circuits ≤ 150 V to ground and ≤ 50 A. Apply Phoenix's separate deferral only to Phoenix, verify any other AHJ relief in writing, and resolve listed-equipment compatibility before energization. A 2026 NEC Class C option is not automatically approved under a local 2023 permit.

Change / applicability
2023 NEC 210.8(F) Exception 2 expired September 1, 2026; Phoenix deferral to March 1, 2027. Affected: qualifying dwelling outdoor outlets and new or replacement equipment within adopted scope.
Required record
Current AHJ rule/deferral, circuit ratings, listing/manufacturer decision and protection test.
Hold point
Before equipment energization.

ES-07Dwelling service surge protection

Provide the listed Type 1 or Type 2 surge-protective device at the accepted service/distribution location. The electrician populates the exact service-versus-feeder section, replacement trigger, rating and manufacturer connection requirements before acceptance.

Change / applicability
2020 NEC dwelling-service SPD addition, retained in the reviewed 2023 summary. Affected: new dwelling service or replacement service equipment; resolve adopted triggers and amendments.
Required record
Exact adopted section/amendment, one-line, SPD type/rating/listing and installed connection photos.
Hold point
Before service energization / final release.

Evidence and Release Record

ItemResult: Pass / Fail / N/A / Not verifiedRequired value / observed result / evidenceSub initials / datePM verification / date
ES-01Not verified
ES-02Not verified
ES-03Not verified
ES-04Not verified
ES-05Not verified
ES-06Not verified
ES-07Not verified

Unverified or failed applicable items block the stated hold point. The subcontractor certifies actual work and evidence; the PM independently verifies and releases after required official inspections. Cory approves only company-standard exceptions, never statutory, permit, design or listing waivers.

Subcontractor certification / date
PM release / date
AHJ / special inspection
Open correction / approved N/A / Anchor-only exception

Applicability Appendix

Record the exact adopted section/amendment, applicable exception, design/product instruction and required test configuration for each item before starting. A model-edition change is not automatically local law, and a local rule exported to another city is an Anchor requirement only when technically compatible and accepted.

This section does not establish an exhaustive all-clause ten-year history or every-city strictness proof. No unverified change is used as a passing criterion; current-only provisions with no demonstrated decade change remain in the full existing acceptance packet rather than falsely appearing here as new changes.

The September 30, 2026 recheck refreshed cited source evidence, corrected the identified Phoenix outlet instruction (ES-05), and separated the expired model HVAC exception from Phoenix's local deferral (ES-06). A historical source can verify a change without establishing its current local applicability; source recheck is not a project release or a complete clause-by-clause supersession certification.

Sources: 2024 Workmanship Standards for Licensed Contractors | PDF pages 17-18; Electrical Service Contractor Code Compliance Rev 0.3 (rechecked 2026-09-30). Verify against current contract documents, approved plans, manufacturer requirements, and applicable code.