QR-12 INSULATION #7CB342 ANCHOR DEVELOPMENT GROUP · GC #358732 · HVAC #365678 · ELEC #365679 ACCOUNTABLE: INSULATION CONTRACTOR qr.azanchordevelopment.com/w/qr-12 SCOPE Insulation, air sealing, energy compliance KEY RELEASE / HOLD POINT Roughs passed; energy / insulation inspection STATUS (NO STEP MAY BE SKIPPED) PM OVERRIDE MUST BE DOCUMENTED 1. Draft 2. Not released 3. Ready 4. Active 5. QC hold 6. Inspection hold 7. Blocked 8. Ready for next trade 9. Released 10. Reopened 11. Closed FIELD DATA COMPANY ROC CLASS / LICENSE # VERIFIED FOREMAN PHONE BASELINE START BASELINE FINISH FORECAST START FORECAST FINISH ACTUAL START ACTUAL FINISH QTY BASIS / TARGET INSTALLED TO DATE PREDECESSOR SUCCESSOR BLOCKER BLOCKER OWNER / PROMISED DATE EVIDENCE REQUIRED BEFORE RELEASE AN UNCHECKED BOX IS NOT PROOF Inspection Photos Test report Checklist As-built BLOCKER → SUPERINTENDENT IMMEDIATELY PM IF CRITICAL-PATH OR UNRESOLVED NEXT SHIFT · CRITICAL SEVERITY = STOP WORK ADG-PROJECT-LOT-QR-12-INSULATION-ENERGY-[AREA]-[PKG-REV] QR Job Board v2 Field-control interface only. Approved permit set, AHJ codes, approved changes and contracts govern.
QR-12

INSULATION

PDF page 20

Insulation

1. PD Insulation not uniform in attic.

AT Insulation should meet minimum specified R factor.

CR Contractor should make necessary corrections to assure uniform thickness and specified R factor.

2. PD Insulation not installed properly.

AT None.

CR Contractor should correct condition as necessary.

3. PD Garage area not insulated.

AT Normally not done unless specified.

CR Contractor should correct only if specified.

Code Compliance Revision 0.3 · Source-currentness recheck: September 30, 2026 · Controlled review checklist

This is a stand-alone code compliance checklist for this trade, added to the workmanship standards above and to full project-code requirements. It is not a complete trade code manual. It covers reviewed 2016–2026 changes and local implementation events; an older provision newly enforced locally is labeled as implementation, not claimed as newly invented code.

Job
Address / unit
Scope
Building / fire AHJ
Permit / edition / amendments
Approved-plan revision
Energy / green path
Applicable section / TIA / local amendment
Project-specific code verification by / date
Subcontractor / foreman
PM

Only affected new, replaced or altered work and legally triggered upgrades are included. The PM selects the applicable legal requirement and the compatible mandatory Anchor overlay before work starts. Unresolved source, limit or listing conflicts remain HOLD, and N/A requires a written reason. Checking a box means the item and its required evidence passed, not merely that it was read.

Where a city's legal minimum is lower, the compatible higher check remains an Anchor standard unless Cory approves a company-only exception. A city's nonadoption alone is not a reason to mark the higher company check N/A; actual scope, technical compatibility and legal/design/listing conflicts must be resolved.

Existing QR phases: QR-12.

IN-01Ceiling insulation increased, then partly relaxed

Install the approved compatible strictness target and document installed depth/density. Evaluate the retained R49 company target rather than automatically reducing to the newest model code's R38.

Change / applicability
2021 CZ2/3 R38→R49; 2024 CZ2/3 R49→R38. Affected: prescriptive ceiling assemblies within the accepted path, local or company scope.
Required record
Accepted path/assembly/target, product R-value and installed thickness/density.
Hold point
Before cover / final insulation release.

IN-02Envelope testing and path-specific leakage limits

Complete the required 50-Pa test and apply the accepted limit: reviewed CZ2 prescriptive maximum 4 ACH50, with separate performance/ERI and small/attached-unit alternatives. Record the actual volume/enclosure basis and all approved exceptions.

Change / applicability
2024 residential energy-code update. Affected: tested dwelling/building scope.
Required record
Signed test, units/denominator, selected path/limit and corrected/retest evidence.
Hold point
Before energy final.

IN-03Ventilation / air-sealing package coordination

Coordinate the continuous thermal/air boundary and accepted mechanical ventilation. Deliver the required measure/test result and obtain redesign approval before substitution.

Change / applicability
2021 package and 2024 credit-path updates. Affected: selected air-sealing/ventilation efficiency measures.
Required record
Assigned measure, pre-cover photo map and accepted test/ventilation reports.
Hold point
Before drywall and energy final.

IN-04Ventilation opening locations

Keep lower vents in the approved bottom-third layout and preserve the full required exception conditions. Insulation and baffles cannot invalidate the roof vent calculation.

Change / applicability
2018 IRC attic-vent reduction update. Affected: vented attics using reduced net-free vent area.
Required record
Roof vent calculation, applicable climate-zone conditions and baffle/inlet/outlet photos.
Hold point
Before attic closure.

Evidence and Release Record

ItemResult: Pass / Fail / N/A / Not verifiedRequired value / observed result / evidenceSub initials / datePM verification / date
IN-01Not verified
IN-02Not verified
IN-03Not verified
IN-04Not verified

Unverified or failed applicable items block the stated hold point. The subcontractor certifies actual work and evidence; the PM independently verifies and releases after required official inspections. Cory approves only company-standard exceptions, never statutory, permit, design or listing waivers.

Subcontractor certification / date
PM release / date
AHJ / special inspection
Open correction / approved N/A / Anchor-only exception

Applicability Appendix

Record the exact adopted section/amendment, applicable exception, design/product instruction and required test configuration for each item before starting. A model-edition change is not automatically local law, and a local rule exported to another city is an Anchor requirement only when technically compatible and accepted.

This section does not establish an exhaustive all-clause ten-year history or every-city strictness proof. No unverified change is used as a passing criterion; current-only provisions with no demonstrated decade change remain in the full existing acceptance packet rather than falsely appearing here as new changes.

The September 30, 2026 recheck refreshed cited source evidence. A historical source can verify a change without establishing its current local applicability; source recheck is not a project release or a complete clause-by-clause supersession certification.

Sources: 2024 Workmanship Standards for Licensed Contractors | PDF page 20; Insulation and Air-Sealing Contractor Code Compliance Rev 0.3 (rechecked 2026-09-30). Verify against current contract documents, approved plans, manufacturer requirements, and applicable code.