QR-18L LV COMMISSIONING #3F51B5 ANCHOR DEVELOPMENT GROUP · GC #358732 · HVAC #365678 · ELEC #365679 ACCOUNTABLE: LOW-VOLTAGE CONTRACTOR qr.azanchordevelopment.com/w/qr-18l SCOPE Low-voltage commissioning KEY RELEASE / HOLD POINT Test reports, labels, owner handoff STATUS (NO STEP MAY BE SKIPPED) PM OVERRIDE MUST BE DOCUMENTED 1. Draft 2. Not released 3. Ready 4. Active 5. QC hold 6. Inspection hold 7. Blocked 8. Ready for next trade 9. Released 10. Reopened 11. Closed FIELD DATA COMPANY ROC CLASS / LICENSE # VERIFIED FOREMAN PHONE BASELINE START BASELINE FINISH FORECAST START FORECAST FINISH ACTUAL START ACTUAL FINISH QTY BASIS / TARGET INSTALLED TO DATE PREDECESSOR SUCCESSOR BLOCKER BLOCKER OWNER / PROMISED DATE EVIDENCE REQUIRED BEFORE RELEASE AN UNCHECKED BOX IS NOT PROOF Inspection Photos Test report Checklist As-built BLOCKER → SUPERINTENDENT IMMEDIATELY PM IF CRITICAL-PATH OR UNRESOLVED NEXT SHIFT · CRITICAL SEVERITY = STOP WORK ADG-PROJECT-LOT-QR-18L-LV-COMMISSIONING-[AREA]-[PKG-REV] QR Job Board v2 Field-control interface only. Approved permit set, AHJ codes, approved changes and contracts govern.
QR-18L

LV COMMISSIONING

The source PDF does not include a separate low-voltage commissioning section; related electrical-system standards are included.

PDF pages 17-18

Electrical Systems

1. PD Malfunctioning of electrical fixtures, switches or outlets.

AT None.

CR Contractor should make necessary repairs.

2. PD Breaker trips with normal use.

AT Breaker should operate as intended.

CR Contractor should replace defective breaker in accordance with manufacturer's warranty.

3. PD Electrical equipment not level, plumb and true.

AT None.

CR Contractor should make necessary repairs.

4. PD Electrical equipment or materials not secure or adequately supported.

AT None.

CR Contractor should make necessary repairs.

5. PD Switch located behind door.

AT All boxes for switches should be located on the side of the doorframe opposite the hinge.

CR Contractor should make necessary repairs.

6. PD Switches or plates span two different materials and are not flush.

AT Switches or plates should not span different types of building materials, vertically or horizontally, unless specified and then should be flush with both materials.

CR Contractor should make necessary repairs.

Code Compliance Revision 0.3 · Source-currentness recheck: September 30, 2026 · Controlled review checklist

This is a stand-alone code compliance checklist for this trade, added to the workmanship standards above and to full project-code requirements. It is not a complete trade code manual. It covers reviewed 2016–2026 changes and local implementation events; an older provision newly enforced locally is labeled as implementation, not claimed as newly invented code.

Job
Address / unit
Scope
Building / fire AHJ
Permit / edition / amendments
Approved-plan revision
Energy / green path
Applicable section / TIA / local amendment
Project-specific code verification by / date
Subcontractor / foreman
PM

Only affected new, replaced or altered work and legally triggered upgrades are included. The PM selects the applicable legal requirement and the compatible mandatory Anchor overlay before work starts. Unresolved source, limit or listing conflicts remain HOLD, and N/A requires a written reason. Checking a box means the item and its required evidence passed, not merely that it was read.

Where a city's legal minimum is lower, the compatible higher check remains an Anchor standard unless Cory approves a company-only exception. A city's nonadoption alone is not a reason to mark the higher company check N/A; actual scope, technical compatibility and legal/design/listing conflicts must be resolved.

Existing QR phases: QR-09L, QR-18L.

LV-01Stair-door release and power-failure interfaces

Implement and witness simultaneous unlocking without unlatching under the applicable fire-alarm, command/release and power-failure conditions. Preserve free egress under the approved locking arrangement.

Change / applicability
2024 IBC 403.5.3 / 1010.2.6 changes. Affected: electrically locked stair/high-rise doors under the accepted egress design.
Required record
Approved cause/effect and point-by-point tests coordinated with door/fire-alarm trades.
Hold point
Before system/door use.

LV-02Access-control locking arrangement

Verify the exact permitted locking arrangement and required release sequence rather than assume any access-control system may hold an egress door locked.

Change / applicability
2024 IBC 1010.2.9 update. Affected: access-controlled egress doors.
Required record
Approved locking basis, hardware and witness-test matrix.
Hold point
Before owner use / final release.

LV-03Energy-lighting control sequence

Program and test the assigned occupancy/manual/daylight/override behavior, including applicable 20-minute off and 24-hour exterior override-return conditions. Document exceptions and commissioning ownership.

Change / applicability
2021/2024 energy-control updates. Affected: lighting or BMS controls assigned to this trade in the accepted energy design.
Required record
Controls schedule, programming record and functional tests.
Hold point
Before controls closeout.

LV-04Dwelling ventilation control labels

Provide the required labeling and coordinate the safe approved sequence with the HVAC trade.

Change / applicability
2018 IMC 403.3.2.4 addition. Affected: whole-house ventilation controls furnished or programmed by this trade.
Required record
Label/sequence and joint function test.
Hold point
Before final controls release.

Evidence and Release Record

ItemResult: Pass / Fail / N/A / Not verifiedRequired value / observed result / evidenceSub initials / datePM verification / date
LV-01Not verified
LV-02Not verified
LV-03Not verified
LV-04Not verified

Unverified or failed applicable items block the stated hold point. The subcontractor certifies actual work and evidence; the PM independently verifies and releases after required official inspections. Cory approves only company-standard exceptions, never statutory, permit, design or listing waivers.

Subcontractor certification / date
PM release / date
AHJ / special inspection
Open correction / approved N/A / Anchor-only exception

Applicability Appendix

Record the exact adopted section/amendment, applicable exception, design/product instruction and required test configuration for each item before starting. A model-edition change is not automatically local law, and a local rule exported to another city is an Anchor requirement only when technically compatible and accepted.

This section does not establish an exhaustive all-clause ten-year history or every-city strictness proof. No unverified change is used as a passing criterion; current-only provisions with no demonstrated decade change remain in the full existing acceptance packet rather than falsely appearing here as new changes.

The September 30, 2026 recheck refreshed cited source evidence. A historical source can verify a change without establishing its current local applicability; source recheck is not a project release or a complete clause-by-clause supersession certification.

Sources: 2024 Workmanship Standards for Licensed Contractors | PDF pages 17-18; Low-Voltage and Controls Contractor Code Compliance Rev 0.3 (rechecked 2026-09-30). Verify against current contract documents, approved plans, manufacturer requirements, and applicable code.